Friend logo

Manufacturing

A 600 m² facility organized into five functional production areas, built around dedicated extrusion, slitting, and packaging equipment.

600m²

Factory floor area

5

Functional areas

3

Production lines

8,000,000PCS

Monthly capacity

Equipment

  • Three custom-built extrusion machines
  • Three custom automatic slitting lines
  • Two semi-automatic packaging machines
Extrusion and slitting machinery inside Friend's production workshop
Production workshop — extrusion and slitting equipment

Inside the Facility

Operational views grouped by the manufacturing stage and facility context they document.

Packaging & Dispatch

Assembly, sealing, and staging views from the packaging area.

Worker assembling elastic straps at a packaging workshop table
Packaging workshop — strap and buckle assembly
Packaging workshop with sealed cartons ready for dispatch
Packaging workshop — carton sealing and staging

Materials & Site

Raw-material storage and the production-site exterior.

Warehouse storage of raw TPE thermoplastic elastomer material sacks
Warehouse — raw TPE material storage
Front entrance and vehicle gate of the Friend factory building
Factory entrance

How Orders Move Forward

  1. 1

    Requirements

    Share target product, specification, color, and volume so Friend can scope material and tooling.

  2. 2

    Sample

    Friend produces a sample run on the matching extrusion or slitting line for your review.

  3. 3

    Confirmation

    Specification, packaging, and branding details are confirmed before production is scheduled.

  4. 4

    Production

    Confirmed orders run on dedicated extrusion, slitting, and packaging equipment.

  5. 5

    Inspection & Dispatch

    Finished goods are checked and packed in the packaging workshop before dispatch.